Deskripsi Pekerjaan
Are you looking to build tomorrowβs infrastructure? STELLAR INTEGRATED SOLUTIONS SDN BHD is seeking a talented Project Drafter β ELV Systems to join our team. We are currently delivering state-of-the-art data center projects and are looking for a detail-oriented professional to support our engineering division.
In this role, you will be instrumental in the design and documentation of Extra Low Voltage (ELV) systems, including fire alarm, security, access control, and structured cabling. You will work closely with senior engineers to translate complex technical requirements into precise drawings and models, ensuring the successful delivery of mission-critical construction projects. If you have a passion for precision and want to work with industry-leading professionals, we want to hear from you.
Tanggung Jawab
- Prepare and maintain accurate technical drawings, including floor plans, sections, and details, using AutoCAD and Revit.
- Design and layout ELV systems for data centers, covering Fire Alarm, CCTV, Access Control, and voice/data cabling.
- Conduct site surveys and measurements to verify field conditions and resolve discrepancies between design and reality.
- Coordinate with project managers and contractors to ensure drawings are implemented correctly on-site.
- Assist in the preparation of Bill of Quantities (BOQ) and tender documentation.
- Ensure all technical documentation complies with local building codes and industry standards.
- Update project records and assist in the resolution of technical queries during the construction phase.
Kualifikasi
- Diploma or Degree in Electrical, Electronics, Telecommunications, or Mechanical Engineering.
- Minimum 2-3 years of experience in drafting, preferably within the construction or data center industry.
- Proficient in AutoCAD and Revit; experience with BIM is highly preferred.
- Strong knowledge of ELV systems, specifically Fire Alarm, Security, and Access Control.
- Excellent command of English and Bahasa Malaysia.
- Ability to work independently and meet tight project deadlines.
- Valid Malaysian IC (Kad Pengenalan) and ability to work in Johor Bahru.