Beranda Loker Detail
G
Information & Communication Technology 🏢 Full Time ⭐️ Terverifikasi

Technical Program Manager, Data Center Construction

Google
Sungai Buloh, Selangor
Estimasi Gaji
MYR 250.000 – MYR 450.000
Live Update
3 Juli 2026
Batas Akhir
3 Jul 2027

Deskripsi Pekerjaan

Are you ready to build the infrastructure that powers the world's most innovative technologies? Google is seeking a highly skilled Technical Program Manager (TPM) to join our Data Center Construction team in Sungai Buloh. In this high-impact role, you will be the driving force behind the end-to-end execution of complex data center builds, ensuring that our global infrastructure scales to meet the ever-increasing demands of our users and enterprise customers.

As a TPM, you will operate at the intersection of engineering, construction, and operations. You will bridge the gap between technical design teams, on-site construction contractors, and global stakeholders to deliver breakthrough capabilities. This position requires a strategic mindset, an eye for operational excellence, and the ability to navigate large-scale capital projects with precision and speed.

You will lead cross-functional teams to resolve technical blockers, manage risk, and optimize schedules while maintaining Google's uncompromising standards for safety, security, and sustainability. If you are a visionary who thrives on solving large-scale engineering challenges, we want you on our team.

Tanggung Jawab

  • Lead end-to-end execution of complex data center construction projects, managing scope, budget, and timelines from design through commissioning.
  • Coordinate cross-functional collaboration between engineering, procurement, legal, and facilities teams to ensure project alignment.
  • Identify, assess, and mitigate project risks, developing contingency plans to prevent bottlenecks in construction workflows.
  • Oversee on-site technical progress, ensuring all building standards and Google infrastructure requirements are met.
  • Manage external partners, contractors, and vendors to ensure deliverables meet contractual and technical specifications.
  • Utilize data-driven insights to optimize site selection, capacity planning, and resource allocation.
  • Drive continuous improvement initiatives to enhance construction efficiency and sustainability metrics across the APAC region.

Kualifikasi

  • Bachelor’s degree in Engineering (Civil, Mechanical, Electrical), Construction Management, or equivalent practical experience.
  • 5+ years of experience in technical program management, specifically within large-scale mission-critical or industrial infrastructure projects.
  • Proven track record of managing multi-million dollar capital expenditure projects with diverse stakeholder groups.
  • Strong technical understanding of data center design, power systems, cooling, and structured cabling.
  • Expertise in project management methodologies (Agile, PMP, or PRINCE2) and tools like Jira, Asana, or MS Project.
  • Exceptional communication skills with the ability to translate complex technical concepts for non-technical stakeholders.
  • Ability to travel as required to regional data center sites and international offices.

Keahlian yang Dibutuhkan

Technical Program Management Data Center Construction Infrastructure Engineering Stakeholder Management Risk Mitigation Project Lifecycle Management Capital Project Execution

Siap Mengambil Tantangan Ini?

Pastikan resume Anda sudah siap. Kirimkan lamaran Anda sekarang sebelum tanggal deadline.

Lamar Sekarang

Lowongan Terkait

Rekomendasi pekerjaan serupa untuk Anda

Lihat Semua